Testing and commissioning of LV and MV switchboards

Depending on the customer’s requirements, we perform a number of detailed tests, including:

  • checking the correctness of the connection of circuits and testing their insulation,
  • measuring the transition resistance (up to 100A d.c.)
  • supplying control voltages to the switchboards – we have our own power supplies for temporary operation during start-up on the site,
  • we perform tests of mechanical operation and interlocks,
  • we perform functional tests of electrical interlocks (both within the switchboard and with all devices cooperating with the switchboard),
  • functional tests of continuity control of switch coils,
  • checking the correct operation of arc protections,
  • forcing currents from the primary side (up to 2400A a.c.),
  • configuration of communication within the switchboard,
  • tests of protection automation,
  • voltage tests.

Check what we have in terms of equipment

Check other
Elsta services

Operating since 1988, Elsta provides comprehensive solutions in the areas of electrical engineering, automation and energy, implementing projects both in Poland and on foreign markets around the world.

Follow us
on social media

Elsta sp. z o.o.
32 Janińska St., 32-020 Wieliczka, PL

CALL US
+48 12 350 13 50

general e-mail office@elsta.pl
e-mail for offer inquiries rfq@elsta.pl

A company registered in the District Court for Kraków Śródmieście in Kraków, XII Commercial Division of the National Court Register KRS 0000100416 REGON 356526640, NIP 6831865970, BDO 000068605,
Share capital PLN 295 100.00 fully paid up.

We will be happy to answer your questions
and help select the right solution,
please contact us.

OR CALL US
+48 12 350 13 50

Elsta sp.z o.o. © 2025